Kurobe Gorge Railway Autumn Leaves in Kurobe, Toyama

Kurobe Gorge Railway Autumn Leaves — photo by Luka Peternel via Wikimedia Commons, CC BY-SA 4.0

Kurobe Gorge Railway Autumn Leaves Finished

黒部峡谷トロッコ電車の紅葉 — Kurobe, Toyama (Hokuriku)

Last updated: Wed, October 14, 2026

🎟️ Book ahead ↓

Typical peak
Thu, Oct 15 – Sun, Nov 15, 2026 (The 2026 edition has concluded — 2027 dates are not yet announced)
Venue
Kurobe Gorge Railway, Unazuki Onsen
Tickets
Unazuki to Keyakidaira: ¥2,480 one way for adults, ¥1,240 for children aged 6–11 (Unazuki–Kanetsuri ¥1,780). Return tickets are valid for two days. The windowed Relax car is ¥600 extra per ride. The gorge is only reachable by this train.
Official site

Tickets — best booked ahead

The gorge is only reachable by the Kurobe Gorge Railway. Book seats ahead for October weekends.

The ticket link is an affiliate link — booking through it supports this site at no extra cost to you.

Open in Google Maps →

The Kurobe Gorge Railway runs open-sided trolley trains from the onsen town of Unazuki deep into Japan's deepest V-shaped gorge, crossing high red bridges over jade-green water. In autumn — typically mid-October to mid-November — the canyon walls turn crimson and gold around the little train, making this one of the country's great foliage rides. After the 2024 Noto Peninsula earthquake the line ran only part of the way, but the full route to Keyakidaira reopened on October 1, 2026 and runs until November 30. Restoration work continues around Keyakidaira, so there you can only visit the station and the visitor center.

Planning for 2027

The 2026 edition of Kurobe Gorge Railway Autumn Leaves was held on Thu, Oct 15. It is usually held between Oct 15 and Nov 15, so that is the part of the calendar to keep free for 2027. The organiser sets each year's date itself, so treat that as a planning window and confirm it before you book anything fixed.

The 2027 date has not been published yet. This page is updated once the organiser publishes it, so it is worth a look again before you book anything non-refundable.

Background

The railway was built in the 1920s and 1930s to haul workers and materials for hydroelectric dam construction in the then-inaccessible Kurobe Gorge. Originally a utility line that carried passengers at their own risk, it later became one of Japan's most beloved sightseeing railways.

In pictures

Getting there

Take the Hokuriku Shinkansen to Kurobe-Unazuki Onsen, change to the Toyama Chiho Railway at Shin-Kurobe and ride to Unazuki-Onsen, then walk about 5 minutes to the trolley's Unazuki Station. The railway asks you to allow at least 15 minutes for this transfer and ticket formalities; from Tokyo the whole trip takes about 3 hours. The trolley stops for the winter after November 30.

Tips

Frequently asked questions

When is the best time to see Kurobe Gorge Railway Autumn Leaves?
Autumn color here usually peaks Oct 15 – Nov 15. Color depends on how cold the nights have been, and peak can land a week either side of the usual window, so check a foliage forecast about a week out.

Maintained by Tetsu Yamamoto · Last verified against the official source: Wed, October 14, 2026

More to see while you’re there

Nearby & related